2025/2026 Long Lake End of Drawdown Notification

16 Apr 2026

LONG LAKE SPRING 2026

END OF 25/26 DRAWDOWN

DATE:  April 16, 2026

Ice is now out on Long Lake and water levels are being returned to normal pool elevation.  During the refill process, flow needs to be maintained on the Brill RIver.  Expect 3+ weeks to get to normal pool elevation.

BRIAN DANIELSEN, P.E. WASHBURN COUNTY HIGHWAY COMMISSIONER

 

Back to News